A missed Local Law 152 filing carries a $5,000 civil penalty, and that is per building. Community Districts 4, 6, 8, 9 and 16 are due by December 31, and those districts exist in every borough except Staten Island. If you manage 40 buildings, how many are on the list, and how many are already done?
You can answer that in an afternoon. With about two months left, this guide walks you through sorting every building into one of four buckets and working backward from the deadline.
Step 1: Pull the list
Start with DOB's LL152 Properties spreadsheet. Filter it to your BINs, and you have your due list. If you manage buildings across several districts, this step alone usually shrinks the problem.
For spot checks on individual buildings, use the DOB NOW public portal lookup. It's the fastest way to confirm what's actually on file for an address.
One note on geography: District 16 is Brooklyn-only, and Staten Island has no districts due this cycle. If your Staten Island buildings are on your radar, they can come off the list.
Step 2: Sort every building into four buckets
Go through your filtered list and place each building in exactly one bucket.
Bucket 1: Filed this cycle. Confirm the filing shows under SAFETY: Compliance Filings on DOB NOW's public portal. Don't rely on your plumber's word or an internal spreadsheet. If the portal shows it, you're done.
Bucket 2: Inspected, not filed. The inspection happened, but the certification hasn't gone in. The certification is due within 60 days of the inspection, and you file it in DOB NOW: Safety for $35.These are your fastest wins. Do them first.
Bucket 3: Not inspected. Book a Licensed Master Plumber (LMP) now. The plumber files a 2-day notice with DOB before inspecting, so build that into your scheduling. This is the bucket that will drive your calendar.
Bucket 4: Exempt or no gas. Several situations landhere:
• R-3 buildings are exempt.
• No gas piping: you file once, for $375.
• Piping but no gas service: you file every cycle,for $480.
• New buildings can ask DOB for a free property verification.

Step 3: Work backward from December 31
Put the deadline on a calendar and count backward. Your calendar graphics should mark these points:
• Now: all Bucket 3 buildings have an LMP booked.
• Inspection date, minus 2 days: the plumber's 2-day notice is filed.
• Inspection date, plus up to 60 days: certification filed in DOB NOW: Safety.
• Before December 31: the extension request, if you need one. This is the hard stop. It must be filed before the deadline, not on it and not after.
The most common cause of a failed inspection is access. The plumber needs to reach every required area, or the inspection can't be certified and has to be repeated. Line up boiler rooms, roofs and mechanical spaces early. Call the super, confirm keys, and warn tenants where in-unit access is needed.
Sidebar: Filed last cycle? 2022 vs. 2026
The same districts were due in 2022. If you filed then, that filing doesn't carry over. This is a new inspection for a new cycle. Before youassume a building's status is unchanged, check whether any buildings wereacquired since 2022, whether gas service has been added, removed or shut off,and whether any filing was made under "no gas" or "noservice" status that no longer applies.
Step 4: Decide on extensions now
Each building gets one extension per cycle. It costs $35 and adds 180 days. Don't wait to see who runs out of time. Decide now.
Extensions make sense for buildings with access problems and buildings where gas work is already underway. They don't make sense for buildings where an inspection can happen next week. Remember that the request itself must be filed before December 31.
Step 5: Budget for what the inspection finds
An inspection can turn up work. Plan for it before the report arrives.
• Corrections are due within 120 or 180 days, depending on the condition, and permits are required where the work calls for them.
• Hazardous conditions are reported immediately to the owner, the utility and DOB. The utility may shut off or lock gas service until the condition is fixed.
A gas shutoff in a multifamily building in winter is a tenant-relations emergency, not just a compliance issue. Ask your plumber early what they expect to find in older piping and set aside a repair budget before the inspection happens.
Then do it again next year
The next cycle comes quickly. 2027 brings Districts 11, 12, 14, 15 and 17. If you manage buildings in those districts, you can start your sort now and get ahead of the next deadline.
SnapCor can help keep every building's deadlines in one place, so the next round starts with your list already built.
See open DOB and DOB Safety violations for any address on your list with SnapShot or book a demo to see how SnapCor tracks deadline sacross your portfolio.
Related reading: A Better Way To Manage Permits · Modernization Started With Retrieval





